13 OAK PARK PRIVATE
13 Oak Park Private photo 2
MAIN FLOOR ENTRY
MAIN FLOOR 2-PIECE POWDER ROOM
MAIN FLOOR HOBBY ROOM
SHELTERED MAIN FLOOR PATIO FACES FOREST
STAIRS TO MAIN LIVING RM LEVEL, DINING, KITCHEN
LIVING ROOM
GAS FIREPLACE
HARDWOOD FLOORS THROUGHOUT
DECK OFF MAIN FLOOR LIVING ROOM
TWO STEPS LEAD FROM LIVING ROOM TO DINING ROOM
DINING ROOM OVERLOOKS LIVING ROOM
BUILT-IN BOOKCASES
ALL APPLIANCES INCLUDED
SOUTH FACING KITCHEN WINDOW
13 Oak Park Private photo 17
13 Oak Park Private photo 18
BREAKFAST AREA WITH DOUBLE DOOR PANTRY
13 Oak Park Private photo 20
PRIMARY BEDROOM
WALK-IN CLOSET TO LEFT OF THIS PICTURE
PRIMARY ENSUITE 4-PIECE BATHROOM
13 Oak Park Private photo 24
SECOND BEDROOM WITH DOUBLE CLOSET
13 Oak Park Private photo 26
PRIVATE 4-PIECE BATHROOM TO SECOND BEDROOM
SECOND FLOOR LAUNDRY
PATH LEADING THROUGH HARDWOOD FOREST
ENJOY BIRD WATCHING, DOG WALKING
13 Oak Park Private photo 31
13 Oak Park Private photo 32
13 Oak Park Private photo 33

13 Oak Park Private

Westboro - Hampton Park, ON K1Z 1B6

Sold
2 Beds
3 Baths
1,500 Sq Ft
Townhouse
This property has sold. Interested in something similar? Ask Filipe →
Virtual Tour Available

About This Property

OFFERS PRESENTED TUESDAY, JUNE 9 AT 3:00PM AS PER FORM 244.Enclave of 19 executive homes, located on quiet cul de sac and surrounded by mature hardwood forest. The 1998 construction of The Oaks established a unique niche that set the benchmark for demanding residential development standards in Ottawa. In 1999 the devlopment won the Greater Ottawa Home Builder Association design awards for Housing Project of the Year. Easy access to the Ottawa River Parkway's walking, beaches, bikepaths. Walk to Scott or Wellington Street for the urban amenities of grocery shopping, cafes, boutiques, fine dining. This home is light filled and spacious, offering updated interiors that reflect comfortable living. Entry level den perfect for a home office or a cosy TV, music, library or hobby retreat. There is a utillity closet and a two-piece powder room on this level. Inside access to the single car garage is on this level. The living room (ceilings 10'5"), dining room (ceilings 8'8") and kitchen level all provide full sized rooms that will allow you to enjoy uncompromised entertaining space for family and friends. North and south facing windows enhance the interiors with soft diffused light. An ergonomically efficient kitchen counter, appliance and cabinet arrangement make meal preparation and hosting a pleasure. A charming breakfast area will get every day off to a great start! Upstairs 2 large bedrooms provide the perfect night time retreat. The principle bedroom has an ensuite 4-piece bath. The second bedroom has a large double closet and enjoys it's own private 4-piece bath. The laundry is conveniently situated on this level. A walk-out sheltered patio is accessed from the main floor den. Enjoy the private deck off the living room that overlooks the forest. Upgrades see Feature Sheet. Also attic insulation recently improved. COMMON USE FEES $476.43 QUARTERLY. NON-COMMON USE FEES $158.84 QUARTERLY.

Property Details

StatusSold
Property TypeTownhouse
Listing TypeSale
Interior Size1,500 sq ft
Bedrooms2
Bathrooms3
Postal CodeK1Z 1B6
Last UpdatedOct 8, 2026 · 12:41 a.m.

Sign in for full listing history and the exact list date.

Features & Amenities

  • View
  • Fireplace
  • Air Conditioning
  • Basement

Thinking of selling in Westboro - Hampton Park?

Filipe & Isabel Ferreira and the Team Filipe track every sale on this street. Get a free, no-obligation valuation and see what your home would list for today.

Request a free home valuation →

TRREB MLS® Attribution

MLS® X13236828

Listed by ROYAL LEPAGE TEAM REALTY

The trademarks MLS®, Multiple Listing Service® and the associated logos are owned by The Canadian Real Estate Association (CREA) and identify the quality of services provided by real estate professionals who are members of CREA. The trademarks REALTOR®, REALTORS® and the REALTOR® logo are controlled by CREA and identify real estate professionals who are members of CREA. Listing data provided by the Toronto Regional Real Estate Board (TRREB). The information contained herein is from sources believed to be reliable but is not guaranteed. Information deemed reliable but not guaranteed accurate by TRREB or Team Filipe / RE/MAX.

MLS®X13236828
TypeTownhouse
CityWestboro - Hampton Park

Team Filipe · RE/MAX · (647) 210-6070

Listed By

ROYAL LEPAGE TEAM REALTY